Wireless remote control operation requires only two operators to perform pile gripping, alignment, and extraction, keeping personnel away from hazardous working areas.
Hydraulic clamping combined with smooth lifting minimizes damage to the pile body, allowing reuse of steel piles and helping to reduce overall construction costs.
H-Section Steel Pile Extractor Features
Performance Parameter
| Model | Unit | BY-PM400DS |
| Rated Working Pressure | MPa | 25–28 |
| Rated Extraction Force | t | 200 |
| Maximum Oil Flow | L/min | 160 |
| Maximum Clamping Force | t | 112 |
| Jacking Cylinder Stroke | mm | 713 |
| Weight (Excluding Hydraulic Power Unit) | kg | 1560 |
| Applicable H-Beam Sizes | mm | 500×300 / 500×400 / 400×400 |