Beiyi Pile Extractor Supports Highway Interchange Construction in Nantong

Nantong Highway Project

Project Background

During the summer construction season, a major underground passage interchange project in Nantong, Jiangsu Province reached a key stage.
After the main structure of the interchange was completed, the steel sheet piles installed on both sides of the foundation pit needed to be removed.

As an important part of the temporary support system, the efficient and safe extraction of these piles directly affected the progress of the project.

Construction Challenge

The steel sheet piles were densely arranged with very small spacing and embedded deeply into the ground.

Key challenges included:

  • Dense pile arrangement on both sides of the structure
  • Pile depth reaching approximately 10 meters
  • Limited operating space
  • Requirement for safe and efficient extraction

Traditional removal methods would be time-consuming and labor-intensive.

To address these challenges, the construction team selected the Beiyi BYPM360LS H-Beam Pile Extractor.

Equipment Solution

The BYPM360LS pile extractor is designed for removing H-beam piles and steel sheet piles used in foundation support systems.

During the project, the equipment was used to extract:

  • 300 × 500 steel sheet piles
  • 300 × 700 steel sheet piles

With its strong clamping force and hydraulic pulling capacity, the pile extractor was able to remove the piles smoothly and efficiently.

Operators controlled the equipment using remote control operation, improving both safety and operational convenience on site.

Construction Results

Throughout the project, the Beiyi pile extractor delivered stable and efficient performance.

Compared with traditional mechanical pile removal methods, the equipment provided several advantages:

  • Integrated design without the need for additional auxiliary equipment
  • Higher working efficiency
  • Reduced labor requirements
  • Lower energy consumption

After extraction, the steel sheet piles were fully recovered and reused, improving material utilization and reducing environmental impact.

Project Summary

The successful completion of this pile extraction work demonstrated the reliability of the Beiyi pile extraction solution in foundation construction projects.

With efficient performance and stable operation, Beiyi equipment continues to support contractors in infrastructure and foundation engineering projects.

Project Information

PROJECT NAME
Highway Interchange Steel Sheet Pile Removal Project
CLIENT
Highway Infrastructure Contractor
CATEGORY
Steel Sheet Pile Removal / Foundation Engineering
SERVICE LOCATION
Nantong, Jiangsu, China
PRODUCT MODEL
BYPM360LS H-Beam Pile Extractor

Need a Similar Solution?

 ✔ Free Technical Evaluation
 ✔ Customized Equipment Matching
 ✔ Fast Engineering Response

Related Projects

WeChat: +86 18115777931