Challenges
Solar power plants require large-scale pile installations. Variations in soil conditions can lead to unstable construction efficiency.
Beiyi Solution
Combine:
- Earth Drills for pre-drilling to reduce resistance.
- Vibratory Pile Drivers to quickly install pile foundations.
- Online/On-Site Technical Support to provide customized parameters and construction strategies, especially in challenging soil conditions.
Results
⚡ Faster installation of solar panel supports
⚡ Reduced foundation construction costs
⚡ Enhanced overall quality and stability of solar plants