Project Overview

During the rapid development of green energy projects, a water-based photovoltaic power station in Guangzhou faced serious construction challenges.

Due to extremely hard local soil conditions, conventional pile driving methods were ineffective, causing delays and impacting overall project progress.

The client urgently required a reliable and high-efficiency drilling solution compatible with their CAT 336 excavator to complete 400 sets of 9-meter photovoltaic piles.

BeiYi Solution: Precise Matching & Fast Response

After evaluating several suppliers, the client selected BeiYi Machinery, backed by over 20 years of manufacturing experience.

Upon receiving the technical requirements, our engineering team carefully analyzed:

  • Pile specification: 400 pcs, 9 meters length
  • Excavator model: CAT 336
  • Geological condition: Hard soil layer

Based on the working conditions, we recommended the BY-AD65000 Earth Drill, equipped with:

  • Custom bracket
  • High-torque power head
  • Heavy-duty drilling rods

This configuration ensured optimal torque output and stable performance under tough soil conditions.

Immediate Delivery from Stock

Understanding the tight schedule, BeiYi immediately arranged dispatch from available stock.

The BY-AD65000 earth drill was delivered to the site on the same day, minimizing downtime and ensuring the project stayed on schedule.

On-Site Technical Support

Professional technicians were sent to the construction site to provide:

  • Installation guidance
  • System commissioning
  • Operational training

This ensured fast equipment integration and immediate production start-up.

Project Result

After installation, the earth drill was quickly mounted onto the CAT 336 excavator.

Under complex geological conditions, the drill demonstrated:

  • Strong torque output
  • Stable penetration performance
  • Efficient drilling speed

The photovoltaic pile boreholes were completed smoothly, significantly improving construction efficiency.

Client Feedback

The client commented:

“The photovoltaic pile project was completed on schedule thanks to the high efficiency of the earth drill. The equipment performs reliably and can be applied to future drilling projects. BeiYi’s service was professional and responsive. We look forward to further cooperation.”